Case Name:Sanya Marina Yacht  
Case Introduction:
This is another successful project we are doing in Hainan Sanya, the other one is Visun International Yacht Club which was opened on 2009-8-23.

Clicks:5712
   
Related pictures

     

The yacht marina supportingThe St.Regis Sanya Yalong Bay is located at St. Regis hotel in Yalong Bay in Sanya City. It’s a newly excavation basin with vertical quaywall and waterbreak so it has good shelter effect and mooring condictions are favorable. Independent main channel connects the sea makes the  yacht easily access.

The marina has 73 berhts(including 50 public berths, 7 speedboat berths,16 independent villas berths, total area is approximate 2296 m2.

The main structure floating dock system adopts 6061(T6) Aluminum ally structure, the floating,the floating body is strengthened plastic cases, the deck adopts solid WPC board. Moveable gangway connects the banks and marina. The gangway uses hinge joint on the bank and sliding connection on the marina. Pontoon structure use high strength bolts connection.

The marina respectively use steel rails, piles and poles to fixed position, using slip connection between the steel rails and piles. The main pontoon width is 2.3, 3m and 4.1m, the fingers width is 1.33m and 1.8m.

The project period is about 3 months, the finishing date is December 15th,2010, we have met the contract duration and technical quality demand, well make sure the project finished according to the schedule. Hotel will be completed and opened in 2011.

 